Planning Board approves Brunswick Square Mall Redevelopment Plan in unanimous consistency determination. The phased plan, presented by township planner Kate Keller, maintains retail as the site's primary use while permitting up to 250 residential units on the Macy's property, with a required 20
Planning Board approves digital billboard conversion; Lamar Advertising won unanimous 10-0 approval to convert one static billboard face to digital LED at 367 Dunhams Corner Road, leased from the East Brunswick Baseball League. Conditions include 8-second message display times, no flashing or
The Redevelopment Agency reviewed three development options for the Area 1A site. FAR Planning presented three concept plans for Area 1A ranging from a 6,000-square-foot convenience store and gas station to a 30,000-square-foot office building. Executive Director Robert Zuckerman reported steady
East Brunswick Planning Board finds data center ordinance aligns with township master plan. The board voted unanimously, 7-0, to adopt a resolution determining that Ordinance 26-21, which would prohibit data centers from commercial, business, and industrial zoning districts, is consistent with the
Board of Adjustment approves second-story addition at Sherman Avenue home with setback variance. Applicants Xiaofeng Zhou and Fayun Chen sought relief for a front yard setback of 24.8 feet where 25 feet is required; the property has maintained the nonconforming setback since 1949. Architect Afshan
East Brunswick Redevelopment Agency approves three routine resolutions, reports progress on Route 18 projects. Chairman Wendell, Commissioner Cohen, Commissioner Furgang, and Commissioner Winston unanimously adopted resolutions awarding architectural services design for a pad site, appointing a
Zoning board unanimously approves setback variance to allow three-season sunroom at Cornell Drive. The board cleared Krishna Menon's application for a 17-by-12-foot glass-enclosed addition on an existing rear deck at 15 Cornell Drive, overriding Village Green-2 zone setback requirements. Applicant